Current Work

September 4, 2008

Let’s see.  The S10 (aka Morgue) app is nearing completion – actually it’s pretty much done, we’re just waiting on the Desktop reps to figure out the NT groups so that users can sign on and start using this app.  The Org Health Survey is proceeding – should be able to start working with some users soon to see how they actually interact with the existing survey tool.  Patient Connection is heating up.  We now have v11 installed and it’s ready to go live on 9/22 – unfortunately before we can do any user testing.  But we’re still going to do user testing and apply any changes to the app while it’s live.  These will for the most part be small, incremental changes that won’t warrant a whole rollout or anything major like that, so it should be OK.

Looks like I’m going to be attached to a couple major projects coming up:  A redesign of our internet site, and one of our intranet.  Both of these will take a lot of work, but I’m looking forward to helping design a task-driven, user data supported site.  It should be a big improvement!

The new hospital – RiverBend – is now open.  I was there to help during its opening and worked a couple different support desks, answering calls and logging them into an issue tracker.  Not very challenging work, but it felt good to be part of the effort.  It’s a very impressive hospital.

Entry Filed under: Administrative, PeaceHealth. .


Recent Posts

Archives

Tags

Categories

Blogroll

Meta